They are expecting a fluffy report that doesn't say anything, or blame anybody. A bit like the Ottawa LRT report.
In reality, the same failure mechanism is working the whole pipe. Fixing it is like patching a 70's concrete bridge. They should just get on with a new one.
But, they can have their fancy report, and wait for the next failure. and patch that. Neat.
No comments:
Post a Comment