Saturday, January 30, 2010

Niagara Tunnel into the Cap Rock


Ah, I love that as soon as I complain that they are hiding something, they come out with their report! What's a guy to do?

January 27th 2010
The tunnel is 5,711 meters (18,737 feet) long at an elevation below the surface of 89 meters (292 feet).
There is no tunnel over-break. TBM averaging 18.5 meters (70 feet) per day

The Concrete Invert Bridge is at 3,725 meters

The Overbreak Restoration Carrier is at 700 meters

There it is! We are in the DeCew, and zooming along at high speed! All their troubles are behind them. No more rock squeeze! I can retire from reporting on this....


No comments: